PMAC Basketball Practice
Addition – $14M
A 36,000 sq. ft. addition to the existing PMAC Facility.
The addition requires removal of the existing concourse
ramps to be replaced with Stadia Stairs. The structure
contains two regulation size basketball courts for Men’s
and Women’s basketball practice. New locker rooms, conference
rooms, and media rooms finish the interior. An elevator
will provide access to the second floor viewing and media
area which leads to walkways above the practice arenas.
Precast concrete, True Stucco, and Metal Panels complete
the exterior to complement the existing façade of the
PMAC. A high end finishes package featuring porcelain
tile, terrazzo flooring, and polished block will coordinate
with University colors.
|